Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: VENTURE GLOBAL CP EXPRESS, LLC×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| VENTURE GLOBAL CP EXPRESS, LLC - MOSS LAKE COMPRESSOR STATION | pipeline_gas | VENTURE GLOBAL CP EXPRESS, LLC | SULPHUR | ✆ Yes | Verify with owner |
| VENTURE GLOBAL CP EXPRESS, LLC: VENTURE GLOBAL CP EXPRESS, LLC | Pipeline | VENTURE GLOBAL CP EXPRESS, LLC | —↗ | ✆ Yes | Verify with owner |
| VENTURE GLOBAL CP EXPRESS, LLC: VENTURE GLOBAL CP EXPRESS, LLC | Pipeline | VENTURE GLOBAL CP EXPRESS, LLC | —↗ | ✆ Yes | Verify with owner |
VENTURE GLOBAL CP EXPRESS, LLC - MOSS LAKE COMPRESSOR STATION
Verify with owner
pipeline_gas· VENTURE GLOBAL CP EXPRESS, LLC· SULPHUR· ✆ contact
VENTURE GLOBAL CP EXPRESS, LLC: VENTURE GLOBAL CP EXPRESS, LLC
Verify with owner
Pipeline· VENTURE GLOBAL CP EXPRESS, LLC· ✆ contact
VENTURE GLOBAL CP EXPRESS, LLC: VENTURE GLOBAL CP EXPRESS, LLC
Verify with owner
Pipeline· VENTURE GLOBAL CP EXPRESS, LLC· ✆ contact
1–3 of 3