Browse assets
Filter 3 assets — sorted by most-overdue first. Coating status is a cycle-based prediction (e.g. tank battery ~12yr, steel bridge ~25yr) — verify last recoat with the operator. Long-lifecycle assets show "Verify with owner".
Owner: GOLDEN PASS PIPELINE LLC×
3 results
| Asset | Type | Owner | Location | Contact | Coating due |
|---|---|---|---|---|---|
| GOLDEN PASS PIPELINE LLC - STARKS COMPRESSOR STATION | pipeline_gas | GOLDEN PASS PIPELINE LLC | STARKS | — | Verify with owner |
| GOLDEN PASS PIPELINE LLC - TRANSCO INTERCONNECT SITE | pipeline_gas | GOLDEN PASS PIPELINE LLC | STARKS | — | Verify with owner |
| GOLDEN PASS PIPELINE LLC: GOLDEN PASS PIPELINE | Pipeline | GOLDEN PASS PIPELINE LLC | —↗ | — | Verify with owner |
GOLDEN PASS PIPELINE LLC - STARKS COMPRESSOR STATION
Verify with owner
pipeline_gas· GOLDEN PASS PIPELINE LLC· STARKS
GOLDEN PASS PIPELINE LLC - TRANSCO INTERCONNECT SITE
Verify with owner
pipeline_gas· GOLDEN PASS PIPELINE LLC· STARKS
GOLDEN PASS PIPELINE LLC: GOLDEN PASS PIPELINE
Verify with owner
Pipeline· GOLDEN PASS PIPELINE LLC
1–3 of 3