Coating leads
Assets due for coating / inspection
Ranked by the regulatory + age-based recoat cycle for each asset type. This is the signal: which assets are statistically due, who owns them, where they are.
500 assets (showing up to 500)
| Status | Asset | Type | Owner | Location | Next due | Basis |
|---|---|---|---|---|---|---|
| overdue | SH 135 over RABBIT CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 0.35 MI NW OF SH 31โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 135 over RABBIT CREEK | bridge | State Highway Agency (TxDOT) | 0.20 MI NW OF SH 31โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | ROSTROM ROAD over GULLY | bridge | County Highway Agency | 0.4 MI N of ESTES RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 37/Jackson Co. over BLACK RIVER | bridge | State Highway Agency (ARDOT) | 2.55 MI W JCT SH 17 - 37โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 67 ML & NB FR over DRAINAGE DITCH | bridge | State Highway Agency (TxDOT) | 2.6 MI N OF US 287โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2618 over EAST WILLOW CREEK | bridge | State Highway Agency (TxDOT) | 3.00 MI E OF RM 386โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 135 over SH 31 | bridge | State Highway Agency (TxDOT) | 1.45 MI SW OF SH 42โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2618 over EAST WILLOW CREEK | bridge | State Highway Agency (TxDOT) | 0.80 MI E OF RM 386โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3259 over CREEK | bridge | State Highway Agency (LADOTD) | .7 MI SOUTH OF LA 125โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0107 over BAYOU DES GLAISE | bridge | State Highway Agency (LADOTD) | 0.9 MILE NORTH OF LA 29โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1405 over SAW PIT GULLY | bridge | State Highway Agency (TxDOT) | 0.1 MI SE OF FM 565โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0107 over BAYOU DES CYPRAIRRES | bridge | State Highway Agency (LADOTD) | 1.68 MILES NORTH OF LA 2โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 776 over BIG CEDAR CREEK | bridge | U.S. Forest Service | 17.0MI W OF FDR 519โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 147 over VENADO CREEK | bridge | State Highway Agency (TxDOT) | 2.80 MI S OF US 96โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0410 over CREEK | bridge | County Highway Agency | 8E .5N 1.5E OF US281/412โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 6 over HIGHLAND BAYOU D.C. | bridge | State Highway Agency (TxDOT) | 0.60 MI NW OF FM 2004โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 247 over ROMAN CREEK(TOWN BRANCH) | bridge | State Highway Agency (TxDOT) | 0.25 MI N OF FM 2821โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | RM 243 over OATMEAL CREEK | bridge | State Highway Agency (TxDOT) | 5.1 MI S OF SH 29โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 35-03 LM 12.72 over Steep Creek | bridge | State Highway Agency (ARDOT) | 3.3 Mi N ClevlndCo-Grapeโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BOMAR ST over TURTLE CREEK | bridge | City or Municipal Highway Agency | 0.1 MI N OF SH 43โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Monroe Farbe Xing over BAYOU DES GLAISES | bridge | County Highway Agency | 0.01 MI. EAST OF LA 451โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3015 over CREEK | bridge | State Highway Agency (LADOTD) | 2.82 MI EAST OF LA 5โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MOCKINGBIRD LN over DRAINAGE DITCH | bridge | City or Municipal Highway Agency | 0.80 MI SW OF LP 463โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 102 Benton 2 over OVER KCS RR | bridge | State Highway Agency (ARDOT) | 0.1 MI N JCT SH 59 & 102โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Gallet Rd over TOUCHETS CANAL | bridge | County Highway Agency | 0.3Mi W of LA 35โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | POAG ST over HAPPY HOLLOW CREEK | bridge | City or Municipal Highway Agency | 0.1 MI S OF TRAVIS STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 355 - 06 - 3.2 over DORCHEAT BAYOU | bridge | State Highway Agency (ARDOT) | 4.39 MI NW COLUMBIA CO LNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 328-02- LM 3.4 over PALATKA DITCH | bridge | State Highway Agency (ARDOT) | 03.46 MI E JCT SH 211โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | PARSONS RD over SPRING CREEK | bridge | County Highway Agency | 0.9 MI NE OF NURSERY DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 217-Logan Co. over Petit Jean River | bridge | State Highway Agency (ARDOT) | 1.0 MI SE JCT SH 23 & 21โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0117 over ST. JOHNS CREEK | bridge | State Highway Agency (LADOTD) | 0.58 MI. SOUTH OF LA 6โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0117 over FLATWOODS CREEK | bridge | State Highway Agency (LADOTD) | 0.34 MI. SOUTH OF LA 6โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 328-02- LM 1.5 over DRAINAGE DITCH | bridge | State Highway Agency (ARDOT) | 01.5 MI E JCT SH 211โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 230-10- LM 3.8 over DRAINAGE DITCH | bridge | County Highway Agency | 93.9 MI E OF US 49โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR948 - LM 3.22 over BIG LAKE | bridge | County Highway Agency | 3.25 MI E OF SH 49โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0171 over BAYOU SAN PATRICIO | bridge | State Highway Agency (LADOTD) | 2.6 MI. NORTH OF LA 483โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-5939 over Four Hills Arroyo | bridge | City or Municipal Highway Agency | 0.08 Mi S Custro Cerrosโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0315 over BAYOU DULARGE | bridge | State Highway Agency (LADOTD) | .01 MI NORTH OF LA 661โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR948 - LM 1.29 over THOMPSON CREEK | bridge | County Highway Agency | 1.3 MI E OF SH 49โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 59 SB over CHOATES CRK & UP RR | bridge | State Highway Agency (TxDOT) | 1.35 MI S OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BUS 59 NB over US 59 | bridge | State Highway Agency (TxDOT) | 1.7 MI S OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3283 over CROOKED CRK | bridge | State Highway Agency (TxDOT) | 3.65 MI S OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 66 over Rowlett Creek | bridge | State Highway Agency (TxDOT) | 2.10 Mi E of SH 78โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 66 over Drain | bridge | State Highway Agency (TxDOT) | 6.0 Mi E of SH 78โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2980 over SMITH CREEK | bridge | State Highway Agency (TxDOT) | 2.45 MI S OF SH 72โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR948 - LM 1.09 over DITCH | bridge | County Highway Agency | 1.11 MI E SH 49โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4026 over FOUR HILLS ARROYO | bridge | City or Municipal Highway Agency | 0.19 MI N WAGON TRAIN STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 285 over Mill Creek Relief | bridge | State Highway Agency (ARDOT) | 2.9 MI E US 65โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LOOP 12 over IH 30 | bridge | State Highway Agency (TxDOT) | AT LOOP 12 INTERCHANGEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 329 SEC.01-1.1 over BEAR CREEK | bridge | State Highway Agency (ARDOT) | 61.2 M E JCT SH 41@ DEQUEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 361-01- LM 0.9 over CANEY CREEK | bridge | State Highway Agency (ARDOT) | 20.92 MI E JCT SH 25 & 36โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3283 over SANDY BR | bridge | State Highway Agency (TxDOT) | 0.20 MI S OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | TELLEPSEN ST over IH 45 NB FR | bridge | State Highway Agency (TxDOT) | 0.85 MI NW OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | GRIGGS RD over IH 45 NBFR | bridge | State Highway Agency (TxDOT) | 0.75 MI SE OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 45 NB FR over BRAYS BAYOU | bridge | State Highway Agency (TxDOT) | 0.40 MI SE OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3349 over AVERY BRANCH | bridge | State Highway Agency (TxDOT) | 3.7 MI S OF US 79โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 350 NBFR over DRAW | bridge | State Highway Agency (TxDOT) | 1.0 MI S OF IH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MH 326 (Marsh Ln) over LP 12 | bridge | State Highway Agency (TxDOT) | 1.70 Mi W of LP 354โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 329 SEC.01-0.7 over WILSON CREEK | bridge | State Highway Agency (ARDOT) | 5.5 MI E OF DEQUEENโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 60 Seb. Co. over Doctors Fork Creek | bridge | State Highway Agency (ARDOT) | 0.49 MI E JCT SH 252โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 635 EBFR over RAWHIDE CREEK | bridge | State Highway Agency (TxDOT) | 1.1 MI W OF IH 35Eโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MACARTHUR BLVD NB over IH 635 | bridge | State Highway Agency (TxDOT) | 3.6 MI W OF IH 35Eโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 610 EB over IH 45 & SH 35 | bridge | State Highway Agency (TxDOT) | IH 610 @ IH 45 (INTERCHGโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2578 over US 175 | bridge | State Highway Agency (TxDOT) | AT INT US 175 & FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0406 over PLANTER'S CANAL | bridge | State Highway Agency (LADOTD) | 1.71 MI NORTH OF LA 23โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0406 over INDUSTRY CANAL | bridge | State Highway Agency (LADOTD) | 3.11 MI NORTH OF LA 23โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BROCKBANK DR over JOES CREEK | bridge | City or Municipal Highway Agency | 0.1 MI S OF LOMBARDY LANโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LOOP 282 over DRAIN | bridge | State Highway Agency (TxDOT) | 0.35 MI N OF SH 16โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | PIERCE ST over FIVE MILE CREEK | bridge | City or Municipal Highway Agency | 0.02 MI N OF KIEST BLVDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | RIVA RIDGE LN over HCFCD DITCH | bridge | City or Municipal Highway Agency | .25MI.S.OF CITY LIMITSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MCLAIN BLVD SB over HCFCD DITCH | bridge | City or Municipal Highway Agency | .3MI S OF W AIRPORT BLVDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 610 WB over IH 45 & SH 35 | bridge | State Highway Agency (TxDOT) | IH 610 @ IH 45 (INTERCHGโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0019 over BAYOU | bridge | State Highway Agency (LADOTD) | 2.3 M NE of LA 19&US 61โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 214 over RUNNING WATER DRAW | bridge | State Highway Agency (TxDOT) | 3.70 MI S OF SH 86โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0071 over BAYOU TOULON | bridge | State Highway Agency (LADOTD) | .5 MI NORTH OF LA 514โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | EDWARD HEBERT BLV over PLANTERS CANAL | bridge | County Highway Agency | D0.5 MI. E. OF HWY. 406โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0650(61 ST.S.) over CREEK | bridge | County Highway Agency | 61ST S.3W OF 81ST W AVEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I 540-SEC 1, WB L over Jenny Lind Street | bridge | State Highway Agency (ARDOT) | N0.95 MI W JCT I540 & 71โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I 630 WB Log 5.80 over ROCK CREEK | bridge | State Highway Agency (ARDOT) | 1.6MI E OF I 430โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LUDINGTON DR. over HCFCD DITCH | bridge | City or Municipal Highway Agency | 0.15 MI E OF FONDREN RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LITTLE YORK RD WB over RED GULLY | bridge | City or Municipal Highway Agency | 0.70 MI W OF MESA RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LITTLE YORK RD EB over RED GULLY | bridge | City or Municipal Highway Agency | 0.70 MI W OF MESA RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I-530 NB T0 I-440 over FOURCHE CREEK | bridge | State Highway Agency (ARDOT) | SO TERMINAL INTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | VETERAN'S MEMORIA over DUNCAN CANAL | bridge | City or Municipal Highway Agency | L0.2MI.W.OF WILLIAMSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | KINGWOOD DR EB over BENS BRANCH | bridge | City or Municipal Highway Agency | 0.20 MI W OF LAKE HOU Pโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LAKEWOOD FOREST D over FAULKEY GULLY | bridge | County Highway Agency | R0.5 MI S OF LOUETTA RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-5835 over PINOS ALTO CREEK | bridge | City or Municipal Highway Agency | 0.2 MI S OF US-180โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CANDLECREEK DR over SEALS GULLY | bridge | County Highway Agency | 0.40 MI S OF LOUETTA RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | GARRETT RD over CARPENTERS BAYOU | bridge | County Highway Agency | 0.65 MI E OF BW 8โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0037 over COMITE RIVER | bridge | State Highway Agency (LADOTD) | 3.7 M SW of LA 64&LA 37โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | OAK LN over FRESH WATER BAYOU | bridge | County Highway Agency | 0.10 MI NE OF RED BUDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over 7th Street | bridge | State Highway Agency (LADOTD) | 1.34 Mi. E. of 182 US 9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Birch Cove Road over Creek | bridge | Bureau of Land Management | 3 MI S OF BARNSDALLโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N. Peachtree Rd N over SOUTH MESQUITE CREEK | bridge | City or Municipal Highway Agency | B0.1 MI SW OF GROSS RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N. Peachtree Rd S over SOUTH MESQUITE CREEK | bridge | City or Municipal Highway Agency | B0.11 MI SW OF GROSS RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CALIFORNIA XING over ELM FK TRINITY RI REL | bridge | City or Municipal Highway Agency | .01 MI E OF ROCHELLE BLVโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | State Highway 253 over Mackenay Creek Seb. Co. | bridge | State Highway Agency (ARDOT) | 5.45 MI S JCT SH 10 & 25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | South Sardis Road over HURRICANE CREEK | bridge | County Highway Agency | 4.4 M N GRANT CO LINEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | C.R. 23, -G- 5.26 over TERRE ROGUE CREEK | bridge | County Highway Agency | 5.25 SE PRESCOTTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 23 -G- 4.90 over TERRE ROUGE CREEK REL | bridge | County Highway Agency | 5 M SE PRESCOTTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3349 over DRAW | bridge | State Highway Agency (TxDOT) | 0.10 MI S OF US 79โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 77/Ables Creek over Ables Creek | bridge | County Highway Agency | 1.2 Mi E SH 293-Selmaโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 285 over DRAW | bridge | State Highway Agency (TxDOT) | 0.45 MI N OF IH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 90 BUS over SAN JACINTO RIVER | bridge | State Highway Agency (TxDOT) | 2.10 MI E OF SHELDON RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over RAMP G | bridge | State Highway Agency (LADOTD) | 0.02 MI SW OF LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0331 over BAYOU TIGRE | bridge | State Highway Agency (LADOTD) | 0.55 MI S. OF LA 14โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 over DRAW | bridge | State Highway Agency (TxDOT) | 3.95 MI E OF FM 11โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0071 over BAYOU LAMOURIE | bridge | State Highway Agency (LADOTD) | 2.96 MI. NORTH OF LA 112โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 369 over MERCER CREEK | bridge | State Highway Agency (TxDOT) | 0.30 MI S OF US 82โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 369 SBFR/WLAWN over WAGGONER CREEK | bridge | State Highway Agency (TxDOT) | 0.80 MI N OF US 67โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 67 NB FR over DRAW | bridge | State Highway Agency (TxDOT) | 3.5 MI N OF US 287โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 39 over BIG CREEK | bridge | State Highway Agency (TxDOT) | 0.45 MI SE OF SH 164โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 39 over LYNN CREEK | bridge | State Highway Agency (TxDOT) | 7.80 MI SE OF SH 164โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 WB over FM 148 | bridge | State Highway Agency (TxDOT) | US 175 & FM 148โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over FM 148 | bridge | State Highway Agency (TxDOT) | US 175 & FM 148โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 NFR over BUFFALO CREEK | bridge | State Highway Agency (TxDOT) | 0.5 MI E OF FM 148โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over BUFFALO CREEK | bridge | State Highway Agency (TxDOT) | 0.5 MI E OF FM 148โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BUD STOY RD over US 175 | bridge | State Highway Agency (TxDOT) | 1.95 MI W OF FM 1390โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | ST FRANCIS LEVEE over ST FRANCIS R.-- HUXTABLE | bridge | Bureau of Land Management | W.G. HUXTABLE PUMP STA.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over DRAW (RR REMOVED) | bridge | State Highway Agency (TxDOT) | 1.2 MI NW OF FM 1390โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1390 over US 175 | bridge | State Highway Agency (TxDOT) | US 175 AT FM 1390โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 369 NBFR over WAGGONER CREEK | bridge | State Highway Agency (TxDOT) | 0.10 MI S OF WESTLAWN DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over BIG BRUSHY CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 0.90 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over BIG BRUSHY CREEK | bridge | State Highway Agency (TxDOT) | 0.40 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 EB over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 2.00 MI NW OF SH 34โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0071 over BAYOU LAMOURIE | bridge | State Highway Agency (LADOTD) | 2.96 MI. NORTH OF LA 112โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0071 over HORSEFARM DITCH | bridge | State Highway Agency (LADOTD) | 1.49 MI. NORTH OF LA 112โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 SFR over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 2.00 MI NW OF SH 34โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | TURNAROUND over US 175 | bridge | State Highway Agency (TxDOT) | 1.40 MI E OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over RAMP F | bridge | State Highway Agency (LADOTD) | 1.40 MI E of Berwick Exiโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090/Ramp E over 3rd St | bridge | State Highway Agency (LADOTD) | 0.15 Mi W of LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 S FRTG RD over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 1.25 MI NW OF FM 1388โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 N FRTG RD over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 0.90 MI W OF FM 987โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 59 NB over CHOATES CRK & UP RR | bridge | State Highway Agency (TxDOT) | 1.35 MI S OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 59 over DRAIN | bridge | State Highway Agency (TxDOT) | 0.15 MI S OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 WB over EAST TEMPE CREEK | bridge | State Highway Agency (TxDOT) | 3.75 MI W OF US 59โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 WB over LONG KING CREEK | bridge | State Highway Agency (TxDOT) | 0.50 MI NW OF US 59โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1519 over LAKE BOB SANDLIN | bridge | State Highway Agency (TxDOT) | 0.0 MI SE OF FRANKLIN C/โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 610 WB ON RAMP over CONN IH610 WB TO IH45 NB | bridge | State Highway Agency (TxDOT) | IH 610 @ IH 45 (INTERCHGโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I35E SB to I635 W over Emerald St | bridge | State Highway Agency (TxDOT) | B3.3 Mi N of LP 12โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WARSCHAK-SCHUETTE over DRAW | bridge | County Highway Agency | 3.69 MI S OF FM 109โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 635 EB over IH 35E | bridge | State Highway Agency (TxDOT) | 3.2 Mi N of Loop 12โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3001 over FLAT CREEK | bridge | State Highway Agency (TxDOT) | 1.10 MI SE OF FM 726โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over La 182/LA70/LOC/DRAINAGE | bridge | State Highway Agency (LADOTD) | 0.7 MI E OF LA182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over WEST APPR ATCHAFALAYA R | bridge | State Highway Agency (LADOTD) | 0.2 MI SE OF LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over 6th | bridge | State Highway Agency (LADOTD) | 1.4 MI W of LA 182/LA 70โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BOYS RANCH ROAD over CLEAR CREEK | bridge | County Highway Agency | 1.30 MI W OF IVY GAP RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 EFR over DRAW | bridge | State Highway Agency (TxDOT) | 1.50 MI NE OF LP 1604โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1405 over SUTTON GULLY | bridge | State Highway Agency (TxDOT) | 2.9 MI S OF FM 565โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 EFR over LIVE OAK SLOUGH | bridge | State Highway Agency (TxDOT) | 1.30 MI NE OF LP 1604โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090/Ramp C over 6th St. | bridge | State Highway Agency (LADOTD) | 8.9 MI EAST OF LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1405 over H L & P CANAL | bridge | State Highway Agency (TxDOT) | 2.0 MI S OF FM 565โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | DELAWARE AVENUE over HILLEBRANDT BAYOU | bridge | City or Municipal Highway Agency | 0.1 MI E OF DOWLEN RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | HAROLD CLARK RD over INDIAN CRK #41 | bridge | County Highway Agency | 2.70 MI E OF FM 2115โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IRR BIA RTE 34 over ACOMA CREEK | bridge | Bureau of Indian Affairs | 5.6 KM EAST OF MCCARTYSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IRR BIA RTE 34 over SAN FIDEL CREEK | bridge | Bureau of Indian Affairs | 2.9 KM WEST OF ACOMITAโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 SFR over BIG BRUSHY CREEK | bridge | State Highway Agency (TxDOT) | 0.40 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IRR BIA RTE 38 over CANYON LARGO WASH | bridge | Bureau of Indian Affairs | 2.7 KM SOUTH OF MCCARTYSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over US 90 EB ON RAMP | bridge | State Highway Agency (LADOTD) | 0.14 MI W of LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 285 over Mill Creek | bridge | State Highway Agency (ARDOT) | 2.9 MI E US 65โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 EBFR over SOUTH NOLAN CREEK | bridge | State Highway Agency (TxDOT) | 1.74 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 EBML over SOUTH NOLAN CREEK | bridge | State Highway Agency (TxDOT) | 1.74 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 EBFR over SOUTH NOLAN CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 1.67 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090 over ON-RAMP | bridge | State Highway Agency (LADOTD) | 0.14 MI W of LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0090/RAMP A over US 90 | bridge | State Highway Agency (LADOTD) | 8.5 MI EAST OF LA 182โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 WBML over SPUR 439 | bridge | State Highway Agency (TxDOT) | 3.03 MI E OF FM 3423โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4425 over RIO PUERCO | bridge | State Highway Agency (NMDOT) | 0.1 MI N OF NM-118/GALLUโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4424 over RIO PUERCO | bridge | City or Municipal Highway Agency | 0.1 MI N OF NM-118/GALLUโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 63 S-17 LM13.2 over L'AIGLE CREEK | bridge | State Highway Agency (ARDOT) | 6.5 MI SW OF HERMITAGEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 63 S-17 LM13.6 over L'AIGLE CREEK RELIEF | bridge | State Highway Agency (ARDOT) | 1.75 MI SW OF HERMITAGEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 7 over Linker Creek | bridge | State Highway Agency (ARDOT) | 5.8 MI N I-40 & 7โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-406 over NORTH CANADIAN RIVER | bridge | State Highway Agency (NMDOT) | 19.2 MI N OF JCT US-56/6โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US-64/84 over RIO CHAMITA | bridge | State Highway Agency (NMDOT) | 0.2 MI W OF NM-17/CHAMAโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-6 over BNSF RAILROAD | bridge | State Highway Agency (NMDOT) | 4.9 MI W OF JCT I-25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-283 over TECOLOTE CREEK | bridge | State Highway Agency (NMDOT) | 13.7 MI W OF JCT I-25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-209 over UNNAMED WATERWAY | bridge | State Highway Agency (NMDOT) | 16.8 MI S OF JCT LOOP-36โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US-180 over South Dugway Canyon | bridge | State Highway Agency (NMDOT) | 3.0 M NW Grant/Catron CLโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-173 over PUMP CANYON | bridge | State Highway Agency (NMDOT) | 3.11 MI W OF JCT NM-511โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2760 over DRAW | bridge | State Highway Agency (TxDOT) | 0.28 MI EAST OF SH 316โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 77 NB over DRAW & STOCK PASS | bridge | State Highway Agency (TxDOT) | 12.3 MI S OF KLEBERG C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S MOSS LAKE RD over BEALS CREEK | bridge | County Highway Agency | 1.9 MI S OF IH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3346 over BRAZOS RIVER TRIBUTARY | bridge | State Highway Agency (TxDOT) | 0.04 MI E OF SH 159โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S 28TH STREET over I 540-SEC 1 Seb. Co. | bridge | State Highway Agency (ARDOT) | 0.53 MI W JCT US 71โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 350 over UP RR & BEALS CREEK | bridge | State Highway Agency (TxDOT) | 0.9 MI S OF IH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-32 over LARGO CREEK | bridge | State Highway Agency (NMDOT) | 12.0 MI S OF JCT US-60โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-32 over UNNAMED WATERWAY | bridge | State Highway Agency (NMDOT) | 8.0 MI S OF JCT US-60โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 over DRAW | bridge | State Highway Agency (TxDOT) | 2.95 MI W OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 NFR over BIG BRUSHY CREEK | bridge | State Highway Agency (TxDOT) | 0.40 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | STONEWALL JACKSON over STEWARTS CREEK | bridge | County Highway Agency | 0.15 MI N OF RIVER PLANTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WOODLANDS PKWY over PANTHER BRANCH | bridge | County Highway Agency | 1.0 MI W OF GROGANS MILLโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 EB over DRAW | bridge | State Highway Agency (TxDOT) | 3.20 MI W OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 WB over DRAW | bridge | State Highway Agency (TxDOT) | 3.20 MI W OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2978 over DRY CREEK | bridge | State Highway Agency (TxDOT) | 3.90 MI S OF FM 1488โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W PLANO PKWY WB over PITTMAN CREEK | bridge | City or Municipal Highway Agency | 0.15 MI W OD ALMA DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W PLANO PKWY EB over PITTMAN CREEK | bridge | City or Municipal Highway Agency | 0.15 MI W OF ALMA DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US-550 over UNNAMED WATERWAY | bridge | State Highway Agency (NMDOT) | 25.0 MI NW OF JCT I-25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US-550 over UNNAMED WATERWAY | bridge | State Highway Agency (NMDOT) | 27.7 MI NW OF JCT I-25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NM-528 over ARROYO DELOS MONTOYAS | bridge | State Highway Agency (NMDOT) | 6.4 MI S OF JCT US-550โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4046 over Piedra Lisa Arroyo | bridge | City or Municipal Highway Agency | 0.23 Mi W of Juan Taboโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4046 over Embudito Arroyo | bridge | City or Municipal Highway Agency | 0.31 M E Jct Menaulโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2978 over BEAR BRANCH | bridge | State Highway Agency (TxDOT) | 1.3 MI S OF FM 1488โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | PASADENA BLVD over LITTLE VINCE BAYOU | bridge | City or Municipal Highway Agency | 0.35 MI S OF SH 225โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | RUSHING RD over DRAINAGE CHANNEL NO 1 | bridge | City or Municipal Highway Agency | 0.20 MI N OF SALEM DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3349 over DRAW | bridge | State Highway Agency (TxDOT) | 1.30 MI S OF US 79โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-4048 over Embudito Arroyo | bridge | City or Municipal Highway Agency | 0.7 Mi E of Eubank Blvdโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WARWICK RD over MESA DRAIN | bridge | City or Municipal Highway Agency | 0.30 MI NE OF FM 76โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W PLANO PKWY over PRAIRIE CREEK | bridge | City or Municipal Highway Agency | 0.15 MI E OF INDEPENDENCโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | ZARAGOSA RD over FRANKLIN CANAL | bridge | City or Municipal Highway Agency | 0.3 MI N OF SH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR I over Red Deer Creek | bridge | County Highway Agency | 0.8 Mi SW of Elliott Stโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | QUEBEC ST over IH 820 | bridge | State Highway Agency (TxDOT) | 0.55 MI SW OF SH 199โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0004 over GRAND BAYOU | bridge | State Highway Agency (LADOTD) | 1.0 MI NORTH OF LA 790โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Baker Rd over IH 10 | bridge | State Highway Agency (TxDOT) | 3.15 Mi E of FM 2886โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Romeal Rd over SLEDGE CANAL | bridge | County Highway Agency | 1.6 Mi W of Joe Rdโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 EB over FM 2886 | bridge | State Highway Agency (TxDOT) | 4.3 Mi E of FM 11โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 WB over FM 2886 | bridge | State Highway Agency (TxDOT) | 4.3 Mi E of FM 11โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MCCALLUM BLVD EB over EAST FORK MCKAMY BRANCH | bridge | City or Municipal Highway Agency | 0.10 MI W OF HILLCREST Rโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 135-03- LM 3.3 over BIG BAY DITCH | bridge | State Highway Agency (ARDOT) | 63.36 MI N JCT SH 18โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Garber Rd. over COULEE | bridge | City or Municipal Highway Agency | 1.17 MI NE of US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 NFR over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 2.00 MI NW OF SH 34โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 217-Logan Co. over Petit Jean River | bridge | State Highway Agency (ARDOT) | 1.2 MI SE JCT SH 23 & 21โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0035 over PLAQUEMINE BRULE BAYOU | bridge | State Highway Agency (LADOTD) | 0.2 MI NE OF LA 95โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0126 over MESSER CREEK | bridge | State Highway Agency (LADOTD) | 6.0 MI W OF LA 3239โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Piney Woods Rd over SIX MILE CREEK | bridge | County Highway Agency | 4.7 MI W OF LA 9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 & SFR over DRAW | bridge | State Highway Agency (TxDOT) | 4.05 MI E OF FM 11โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Domino Rd over CHOCTAW CREEK | bridge | County Highway Agency | 1.5 MI W OF LA 147โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Grover Jones Rd over BAKER CREEK | bridge | County Highway Agency | 2.7 MI. S.E. OF U.S.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Grover Jones Rd over WILLIAMS CREEK | bridge | County Highway Agency | 3.6 MI. S.E. OF U.S.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3327 over KINGS CREEK | bridge | State Highway Agency (TxDOT) | 2.7 MI E OF US 183โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BS 36 over HOG BRANCH | bridge | State Highway Agency (TxDOT) | 0.55 MI S OF SH 105โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | KENDALL LN over MARLIN BR #7 WAC | bridge | City or Municipal Highway Agency | 1.70 MI W OF LP 340โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Village Rd over TRIB. TO MACKS BAYOU | bridge | City or Municipal Highway Agency | 0.2 MI N OF HWY 72โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N GEN MCMULLEN DR over APACHE CREEK | bridge | City or Municipal Highway Agency | 0.8 MI N OF W COMMERCEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MOCKINGBIRD LN over LONE TREE CREEK | bridge | City or Municipal Highway Agency | 0.15 MI SW OF LP 463โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 327 Newton over DRY BRANCH | bridge | State Highway Agency (ARDOT) | 1.5 MI SW OF JASPERโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | GRIMES ST over DRAW - NO NAME | bridge | City or Municipal Highway Agency | 0.2 MI N OF E HOUSTON STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WIPPRECHT ST over HUNTING BAYOU | bridge | City or Municipal Highway Agency | 0.15 MI S OF IH 610โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0124 over SLOUGH | bridge | State Highway Agency (LADOTD) | 0.7 MI N OF LA 8โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0008 over RHINEHART CREEK | bridge | State Highway Agency (LADOTD) | 2.3 MI EAST OF US 84โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I-540 over Creek-Sebastian Co. | bridge | State Highway Agency (ARDOT) | 250 Ft E Jct I540 & 25โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Seven Pines Rd over Caney Creek | bridge | County Highway Agency | 3.5 MI S OF HWY 160โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | POWER LINE ROAD over COYOTE ARROYO | bridge | Owner code 72 | 0.4 MILES SOUTH OF PENNSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0008 over GREENS CREEK | bridge | State Highway Agency (LADOTD) | 1.73 MI EAST OF US 84โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N WALTERS ST over MENGER CREEK | bridge | City or Municipal Highway Agency | 0.42 MI S OF IH 35โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I-540 over Mill Creek Seb. Co. | bridge | State Highway Agency (ARDOT) | 0.2 MI W US 71โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0008 over FLATS CREEK | bridge | State Highway Agency (LADOTD) | 3.8 MI EAST OF US 84โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E1360 over CREEK | bridge | County Highway Agency | 2.4 MI S FEATHERSTONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Le Violon Rd. over ILE DES CANNES COULEE | bridge | County Highway Agency | 1.5 Mi NW of LA 342โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 81/287 SBL over BRUSHY CREEK | bridge | State Highway Agency (TxDOT) | 1.7 MI N OF LOOP 249โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 6035 over MCMURTERY BRANCH | bridge | U.S. Forest Service | 1.6 MI E OF LE 208โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CAUSEWAY BLVD over VETERANS MEMORIAL BLVD. | bridge | County Highway Agency | 0.2MI.N.OF I-10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 6026 over PIDGEON CREEK | bridge | U.S. Forest Service | 3.4 MI S OF HWY 63โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W SAN PATRICIO AV over DRAIN | bridge | City or Municipal Highway Agency | E0.25 MI NW OF SH 359 BUSโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3094 over KANSAS CITY SOUTHERN RR | bridge | State Highway Agency (LADOTD) | 3.6 MI NORTH OF LA 511โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | EARL ST over ATLANTIC CANAL | bridge | City or Municipal Highway Agency | 0.01 MI S OF FM 366โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | ADAMS RD over DRAW | bridge | County Highway Agency | 0.10 MI S OF AUTRY RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 114 over YOUNG CREEK | bridge | State Highway Agency (TxDOT) | 2.5 MI E OF US 82โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 114 over JAKE CREEK | bridge | State Highway Agency (TxDOT) | 3.7 MI E OF US 82โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Marathon Rd over GRAY CREEK | bridge | County Highway Agency | 2 MI E OF HWY 7โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WESTVIEW DR EB over SPRING BRANCH | bridge | City or Municipal Highway Agency | 0.65 MI W OF WIRT RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 114 over HURRICANE CREEK | bridge | State Highway Agency (TxDOT) | 6.9 MI E OF US 82โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1699 over BEAVER DAM CREEK | bridge | State Highway Agency (TxDOT) | 4.7 MI E OF FM 1158โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1699 over CANEY CREEK | bridge | State Highway Agency (TxDOT) | 2.3 MI E OF FM 1158โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Le Violon Rd over ILE DES CANNES COULEE | bridge | City or Municipal Highway Agency | 1 Mi North of Congress Sโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | State Highway 253 over Mackenay Creek Seb. Co. | bridge | State Highway Agency (ARDOT) | 3.40 MI S JCT SH 10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N. Causeway BLVD over VETERANS MEMORIAL BLVD | bridge | County Highway Agency | 0.2MI.N.OF I-10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 7 over Creek | bridge | State Highway Agency (ARDOT) | 4.1 MI N I-40 & SH 7โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3142 over MP RR @ TAFT | bridge | State Highway Agency (LADOTD) | .45 MI NORTH OF LA 3127โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0432 over AMITE RIVER RELIEF | bridge | State Highway Agency (LADOTD) | 3.2 M NW OF LA 38โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | PINES RD over I-20 | bridge | State Highway Agency (LADOTD) | 1.9 MI EAST OF LA 526โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 125 Marion over KING BRANCH | bridge | State Highway Agency (ARDOT) | 2.12 MI W JCT SH 235 &12โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Hwy 3102 over LARTO BAYOU | bridge | County Highway Agency | 3.2 MI W of LA 124โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0432 over AMITE RIVER @ FELIXVILLE | bridge | State Highway Agency (LADOTD) | LA 432โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 135-03- LM 3.3 over THOMPSON CREEK | bridge | State Highway Agency (ARDOT) | 23.32 MI N JCT SH 18โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 87/Fulton Co. over CREEK | bridge | State Highway Agency (ARDOT) | 6.9 MI N US 62โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Galbert Rd. over COULEE | bridge | City or Municipal Highway Agency | 0.85 Mi W of I-10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | RodneyParham over RUSHING CREEK | bridge | State Highway Agency (ARDOT) | 1.7 E OF I 430โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I-530 ML LM 28.24 over South Fork Caney Bayou | bridge | State Highway Agency (ARDOT) | 1.0 Mi N SH 104-WhiteHalโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0043 over DAYS CHURCH BRANCH | bridge | State Highway Agency (LADOTD) | 0.4 M S OF LA 38โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0043 over LIVERPOOL BRANCH | bridge | State Highway Agency (LADOTD) | 1.1 M S OF LA 38โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S. A RD. over COULEE | bridge | Town or Township Highway Agency | 0.6 miles South of US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Arnaudville Rd. over Bayou Carencro | bridge | County Highway Agency | 1.2 MI N OF LA 1252โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | HADLEY DRIVE over TRIB JOHNSON CREEK | bridge | City or Municipal Highway Agency | 100 FT NORTH HELEN DRIVEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | MILLS BRANCH DR over TAYLOR GULLY | bridge | City or Municipal Highway Agency | 0.20 MI SE OF DOGWOODโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E1150 over CREEK | bridge | County Highway Agency | 5.1 S .5 W OF ROLANDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 384/Jackson Co over VILLAGE CREEK | bridge | State Highway Agency (ARDOT) | .1.6 MI E JCT US 67โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N4770 over CREEK | bridge | County Highway Agency | 5.1 S 1. W OF ROLANDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WOODBERRY DR over COTTONWOOD CREEK | bridge | City or Municipal Highway Agency | 0.08 MI N OF MEADOWBROOKโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 3736 - PCT 4 over WILLOW CREEK | bridge | County Highway Agency | 0.6 MI. W. OF FM 920โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 373 over WHEAT CREEK | bridge | State Highway Agency (TxDOT) | 2.0 MI S OF FM 1630โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 82 WB/US 277 S over BN RR(FUT ALEXANDRIA ST) | bridge | State Highway Agency (TxDOT) | B2.0 MI E OF FM 369โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FANNIN ST over BUFFALO BAYOU | bridge | City or Municipal Highway Agency | 0.2 MI S OF IH 10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 384/Jackson Co over VILLAGE CREEK | bridge | State Highway Agency (ARDOT) | .2 MI EAST JCT US 67โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0147 over CREEK | bridge | State Highway Agency (LADOTD) | 2.03 MI EAST OF LA 505โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0147 over CREEK | bridge | State Highway Agency (LADOTD) | 2.09 MI EAST OF LA 505โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0147 over FLAT CREEK | bridge | State Highway Agency (LADOTD) | 6.28 MI EAST OF LA 505โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Springridge-Texas over MILL CREEK | bridge | County Highway Agency | 0.4 MI. EAST OF TEXโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA1255 over CRIP RAILROAD | bridge | State Highway Agency (LADOTD) | 4.8 MI NORTH OF LA 505โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0084 over CROSS BAYOU | bridge | State Highway Agency (LADOTD) | 2.6 MI EAST OF LA 566โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0505 over HALFWAY CREEK | bridge | State Highway Agency (LADOTD) | 1.0 MI EAST OF LA 147โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 1054 over GLEN CREEK | bridge | State Highway Agency (TxDOT) | 11.89 MI SOUTH OF US 180โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Long Bell Road-CR over Cross Bayou | bridge | County Highway Agency | 0.16 Mi E JeffCo-BayouMeโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NEW VALLEY HI DR over DRAW | bridge | City or Municipal Highway Agency | 0.25 MI SW OF IH 410โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | TIMBERWILDE RD over CULEBRA CREEK | bridge | City or Municipal Highway Agency | 0.40 MI NE OF FM 471โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Calhoun CR 35 Z-D over CREEK | bridge | County Highway Agency | 1 MI S CO RD 37โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0640 over TURKEY CREEK | bridge | County Highway Agency | 1.5S .8W OF HENNESSEYโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 303 over BIG CREEK | bridge | U.S. Forest Service | 3 MI S OF SH63โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 928 - C over BIG BAY DITCH NO 1 | bridge | County Highway Agency | .89 W LESTER CORD 60โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Us49/Sec-10/L19.4 over Lick Creek | bridge | State Highway Agency (ARDOT) | 2.0 Mi East Walnut Corneโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 SFR over BIG BRUSHY CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 0.90 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 560 - A over COCKLE BURR SLOUGH | bridge | County Highway Agency | 2 M S & .5 M E OF MONETTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | State Highway 255 over Mill Creek | bridge | State Highway Agency (ARDOT) | 1.54 SO OF US 64โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0460 over SPRING CREEK | bridge | County Highway Agency | .3E 3.3N 3.8E OF DRUMMONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2900 over CREEK | bridge | County Highway Agency | .6N 3E .5N OF BISONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N3470 over MAXWELL CREEK | bridge | County Highway Agency | 2.1 N OF OIL CENTERโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N3770 over CREEK | bridge | County Highway Agency | 2.0 S & 3.0 E OF OLNEYโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 3422C MAJOR over CREEK | bridge | County Highway Agency | 2.1 MI N SH 5โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E1125 (SW 81) over CREEK | bridge | City or Municipal Highway Agency | SW 81ST;EAST OF PENNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FRANKLIN RD over CREEK | bridge | City or Municipal Highway Agency | 0.1 W 72ND AVE NEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 6776C over CREEK | bridge | County Highway Agency | 1 S & 1.2 E OF WEWOKAโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LOUISE ST over PENA DRAW | bridge | City or Municipal Highway Agency | 0.10 MI SE OF GOVE STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0650(61ST. ST. S over CREEK | bridge | County Highway Agency | )61ST S. .5E OF 97TH W AVโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0004 over TURKEY CREEK | bridge | State Highway Agency (LADOTD) | .7 MI EAST OF LA 15โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W ELGIN ST over CREEK | bridge | City or Municipal Highway Agency | 0.1 MI W OF ELM PL.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 NB over FM 133 | bridge | State Highway Agency (TxDOT) | IH 35 @ FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAU 4472 (SOUTH A over DRAINAGE CANAL | bridge | City or Municipal Highway Agency | VSOUTH AVE AT 10 ST.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Cr-604/Z-G/L-0.42 over Little Cypress | bridge | County Highway Agency | .5 Miles East Jct Sh 39โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Cr-405/Z-B/L-0.35 over Ditch | bridge | County Highway Agency | .1Mi E Jct Sh 44 & Cr405โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0900 over CREEK | bridge | County Highway Agency | 1S;1.7E OF SH 165โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over CREEK | bridge | State Highway Agency (ODOT) | 0.7 MI E STEPHENS C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 60 over CREEK | bridge | State Highway Agency (ODOT) | 0.2 MI N JCT SH 58โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 SB over 2ND ELM CREEK | bridge | State Highway Agency (TxDOT) | 0.25 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 EFR over 2ND ELM CREEK | bridge | State Highway Agency (TxDOT) | 0.25 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0010 over AIRLINE HWY US 61 | bridge | State Highway Agency (LADOTD) | 1.7 MI EAST OF I-610โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Paschal Road over Greasy Creek - Wash. Co. | bridge | County Highway Agency | 6.3 M E JCT HWY 71โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 15-G-Oak Ridge over CREEK | bridge | County Highway Agency | 2MI SW OF DALTONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 15-G- OAK RIDG over CREEK | bridge | County Highway Agency | E2MI SW OF DALTONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 15-G-Oak Ridge over CREEK | bridge | County Highway Agency | 3.5MI SW OF DALTONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Sh145/Sec-4/L11.4 over Bayou Deview | bridge | State Highway Agency (ARDOT) | 25.3 Mi West Of Sh 39 Jctโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Arrowhead Rd.- D over Creek | bridge | County Highway Agency | 0.84 M E of jct. CR406โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0010 over GROUND | bridge | State Highway Agency (LADOTD) | 1.7 MI EAST OF I-610โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Co Hwy 71 - D over Overcup Creek | bridge | County Highway Agency | 0.74 M E of jct w/SH 9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Dallas CR 119 over CREEK | bridge | County Highway Agency | .6 MI N OF HWY 273โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Clark CR 38 Z-A over WOLF CREEK | bridge | County Highway Agency | .1 MI W JCT CO RD 184โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LANDER RD over CHOCOLATE BAYOU | bridge | County Highway Agency | 3.2 MI SW OF JCT US 87โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 181 NB ML over PAJARITO CREEK | bridge | State Highway Agency (TxDOT) | 0.95 MI SE OF SH 97โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0002 over BONNE IDEE BAYOU | bridge | State Highway Agency (LADOTD) | 4.58 MI EAST OF US 165โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 51 over LOLLAR BRANCH | bridge | State Highway Agency (TxDOT) | INTERSECTION OF FM 51&56โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 EFR over 3RD ELM CREEK | bridge | State Highway Agency (TxDOT) | 0.70 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Union Hill Rd over Branch | bridge | County Highway Agency | .5 M SE of Fannieโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LINDSEY ST. over BISHOP CREEK TRIB. | bridge | City or Municipal Highway Agency | 2.5 MI E JCT I-35โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over ICE HOLLOW CREEK | bridge | State Highway Agency (ODOT) | 5.4 MI W CARTER C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 303 over SOUTH PRONG CREEK | bridge | U.S. Forest Service | 3.3 MI S OF SH63โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over CREEK | bridge | State Highway Agency (ODOT) | 3.8 MI W CARTER C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SUNSHINE RD over BOEUF RIVER | bridge | County Highway Agency | BOEUF R. AT FISKE UNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over CREEK | bridge | State Highway Agency (ODOT) | 1.9 MI W CARTER C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 536 over LODI CREEK | bridge | State Highway Agency (TxDOT) | 0.70 MI SW OF LP 181โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 7762C over DRAINAGE OFF BORROW PIT | bridge | County Highway Agency | 1.1 NORTH OF MUTUALโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S. Cove Creek Roa over Garrett Hollow -Wash Co. | bridge | County Highway Agency | d6.2 MI SO OF CO RD 21โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 7504 over CREEK | bridge | County Highway Agency | 3.1 W 3 N SENTINELโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Cove Creek Road over Cove Creek - Wash Co. | bridge | County Highway Agency | 2.40 SO OF CO RD 21โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Sh-145/Sec4/L11.1 over Bayou Deview | bridge | State Highway Agency (ARDOT) | 35 Miles West Of Jct Sh 3โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0100 over BOGGY CREEK | bridge | County Highway Agency | 11.9N .5E OF AVARDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 200 over WILSON BRANCH | bridge | State Highway Agency (TxDOT) | 1.0 MI W OF FM 1434โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 SB over LAS RAICES CREEK | bridge | State Highway Agency (TxDOT) | 2.0 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 7242C(41 ST.S) over CREEK | bridge | County Highway Agency | 41ST S. .5E 137TH W. AVEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 3108C over CREEK | bridge | County Highway Agency | 2.2E OF GARLANDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over CREEK | bridge | State Highway Agency (ODOT) | 2.0 MI W CARTER C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 7 over CREEK | bridge | State Highway Agency (ODOT) | 0.6 MI W CARTER C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2380 over BOGGY CREEK | bridge | County Highway Agency | 6E 5.3N OF SH14/US64โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S. Cove Creek Roa over Hog Head Creek - Wash. | bridge | County Highway Agency | d0.02 MI SO OF CO RD 21โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2660 over INDIAN CREEK | bridge | County Highway Agency | 1W 2.5N OF SH58/US60โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N1690 (0524C) over CREEK | bridge | County Highway Agency | 1.5 E 6.7 N OF TEXOLAโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH337 over DARK VALLEY CREEK | bridge | State Highway Agency (TxDOT) | 5.2 MI E OF SH 16โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2421 over GOURDNECK CREEK | bridge | State Highway Agency (TxDOT) | 8.5 MI N OF FM 920โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 EFR over LAS RAICES CREEK | bridge | State Highway Agency (TxDOT) | 2.0 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 over DRAW | bridge | State Highway Agency (TxDOT) | 3.8 MI S OF FM 133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CYPRESS HILL DR over HCFCD DITCH | bridge | County Highway Agency | 0.30 MI S OF CYPRESSWOOโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N1820 over TURKEY CREEK | bridge | County Highway Agency | 3.6 S 5.5 W OF SAYREโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E1220 over TURKEY CREEK | bridge | County Highway Agency | 3. S 4.9 W OF SAYREโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CENTER POINT over POTUBBI CREEK | bridge | County Highway Agency | .1S OF LONE PINEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 35 NB over SERVICE RD | bridge | State Highway Agency (TxDOT) | 10.55 MI N OF WEBB C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BURLESON RD over COUNTRY CLUB CREEK | bridge | City or Municipal Highway Agency | 0.4 MI S OF E OLTORFโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | W Main ASH FLAT over NORTH BIG CREEK | bridge | City or Municipal Highway Agency | 0.6 NW US 167โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0430 over CREEK | bridge | County Highway Agency | 2.1S .9W OF SH15/US281โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0560 over ROCK CREEK | bridge | County Highway Agency | .6N 4.7E OF BISONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 283 over SANDSTONE CREEK | bridge | State Highway Agency (ODOT) | 2.5 MI N BECKHAM C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CHESTNUT AVE over HAIKEY CREEK | bridge | City or Municipal Highway Agency | S OF BOSTON)โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 3815 over FLOOD CANNEL | bridge | County Highway Agency | 7.0 S & 0.5 W HOBARTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 19 over IRRIGATION CANAL | bridge | State Highway Agency (ODOT) | 3.7 MI W U.S. 183โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | GREENBRIAR STREET over DITCH | bridge | City or Municipal Highway Agency | .29MI N US 63โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 820 EB over LAKE WORTH CAHOBA HERON | bridge | State Highway Agency (TxDOT) | 1.8 MI NE OF SILVER CK Rโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 820 WB over NAVAJO TRAIL | bridge | State Highway Agency (TxDOT) | 1.5 MI SW OF SH 199โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FDR 511 over CONNER CREEK | bridge | U.S. Forest Service | 1.5 MI N OF SH7โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2620 over CREEK | bridge | County Highway Agency | 6W&1.2S OF JCT SH7&SH65โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 49 over CREEK | bridge | State Highway Agency (ODOT) | 2.5 MI.W. JCT. US62โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 3802 over FLOOD CANAL | bridge | County Highway Agency | 4.0 W 1.0 N ROOSEVLTโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E1080 over GYP CREEK | bridge | County Highway Agency | 5.N 2.1W OF CORNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | STROUD STREET over DITCH | bridge | City or Municipal Highway Agency | .29MI E JCT US 49โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SW 29TH ST. over LIGHTNING CREEK | bridge | City or Municipal Highway Agency | .1 MI E OF ROBINSONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAU 7740 (GORE BL over WOLF CREEK | bridge | City or Municipal Highway Agency | V2.7 MI E FAU 7601โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 3 over LEADER CREEK O'FLOW | bridge | State Highway Agency (ODOT) | 7.5 MI E PONTOTOC C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 NFR over BIG BRUSHY CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 0.90 MI W OF FM 2578โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 175 WB over DRAW (RR REMOVED) | bridge | State Highway Agency (TxDOT) | 1.2 MI NW OF FM 1390โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | VALLEY DRIVE over DITCH | bridge | City or Municipal Highway Agency | .2 MI E GEYER SPG RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 69 over CREEK | bridge | State Highway Agency (ODOT) | 2.9 MI S JCT SH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2790 over KINGFISHER CREEK | bridge | County Highway Agency | 5.5W .8S OF KINGFISHERโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IRR 1662C over CREEK | bridge | County Highway Agency | 3N&1.5W OF JCT US277&SH1โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | E0340 over FRISCO CREEK | bridge | County Highway Agency | 11.5S 2.6W OF GUYMONโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N3080 (SANTA FE) over LIGHTNING CREEK | bridge | City or Municipal Highway Agency | .3N OF SW 44TH STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 3349 over BOGGY CREEK | bridge | State Highway Agency (TxDOT) | 2.00 MI S OF US 79โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 69 over STINK CREEK | bridge | State Highway Agency (ODOT) | 1.4 MI S JCT SH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | N2900 over SAND CREEK | bridge | County Highway Agency | .2W 1.5S OF KREMLINโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | 23RD ST over CREEK | bridge | City or Municipal Highway Agency | 193RD E .3S OF 51ST Sโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 50 over HOUSTON CREEK | bridge | State Highway Agency (ODOT) | 0.6 MI S JCT US-64โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 3 over LEADER CREEK | bridge | State Highway Agency (ODOT) | 7.6 MI E PONTOTOC C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FRANKLIN RD over LITTLE RIVER | bridge | City or Municipal Highway Agency | 0.2 W 72ND AVE NEโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 3 over ABANDONED R.R. UNDER | bridge | State Highway Agency (ODOT) | 5.3 MI E PONTOTOC C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 177 over BNSF R.R. UNDER | bridge | State Highway Agency (ODOT) | 0.4 MI S JCT. S.H.15โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | PADDY HAMILTON RD over US 190 | bridge | State Highway Agency (TxDOT) | 1.38 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 69 over PRYOR CREEK O'FLOW | bridge | State Highway Agency (ODOT) | 1.8 MI S JCT SH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 1207 over CLEAR BOGGY CREEK O'FLOW | bridge | County Highway Agency | 1.0 M W 5 MI N BOSWELLโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 WBFR over SOUTH NOLAN CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 1.68 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 EBML over SOUTH NOLAN CREEK RELIEF | bridge | State Highway Agency (TxDOT) | 1.67 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Greasy Valley Roa over Buckley Branch-Wash. Co. | bridge | County Highway Agency | d7.4 MI S SH 45โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | V.HUBERT SMITH DR over CREEK | bridge | City or Municipal Highway Agency | .600' E US-69B & SOUTH AVโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SEMINARY RIDGE DR over BOGGY CREEK | bridge | City or Municipal Highway Agency | 0.25 MI S OF MANASSAS DRโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | WILLIAM CANNON DR over S FORK WILLIAMSON CREEK | bridge | City or Municipal Highway Agency | 0.10 MI SE OF BRODIE LNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 2 over PINE CREEK | bridge | State Highway Agency (ODOT) | 13.68 N JCT SH-3โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 62 WB over STREET & UP R.R. UNDER | bridge | State Highway Agency (ODOT) | 3 MI. E JCT SH 16โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 62 EB over STREET & UP R.R. UNDER | bridge | State Highway Agency (ODOT) | 3 MI. E JCT SH 16โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 5 over COW CREEK | bridge | State Highway Agency (ODOT) | 0.9 MI N JCT US70โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 190 WBFR over SOUTH NOLAN CREEK | bridge | State Highway Agency (TxDOT) | 1.75 MI E OF FM 439โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BEEHIVE LOOP over SPRING BRANCH | bridge | County Highway Agency | 0.9 MI N of LA 110โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | U.S. 69 over PRYOR CREEK | bridge | State Highway Agency (ODOT) | 2.1 MI S JCT. SH 20โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 2801 over ELM FORK OF RED RIVER | bridge | County Highway Agency | 4.3 MI NORTH OF REEDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over BROAD STREET | bridge | State Highway Agency (LADOTD) | 2.52 MI EAST OF LA 14โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over BROAD STREET | bridge | State Highway Agency (LADOTD) | 2.52 MI EAST OF LA 14โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over US 90 | bridge | State Highway Agency (LADOTD) | I-210 OVER US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over US 90 | bridge | State Highway Agency (LADOTD) | I-210 OVER US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over UPRR | bridge | State Highway Agency (LADOTD) | .2 MI EAST OF US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over UPRR | bridge | State Highway Agency (LADOTD) | .2 MI EAST OF US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over UPRR | bridge | State Highway Agency (LADOTD) | .2 MI EAST OF US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over OPELOUSAS STREET | bridge | State Highway Agency (LADOTD) | .5 MI EAST OF US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over OPELOUSAS STREET(LA 3020 | bridge | State Highway Agency (LADOTD) | .5 MI EAST OF US 90โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over I210 NB TO I10 WB | bridge | State Highway Agency (LADOTD) | I-210 NB TO I-10 WBโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | I0210 over I-10 | bridge | State Highway Agency (LADOTD) | 2.1 MI W of LA 397โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | GOODMAN RD over I-10 | bridge | State Highway Agency (LADOTD) | 0.2 MI OF LA 3020โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3015 over COOK CREEK | bridge | State Highway Agency (LADOTD) | 8.36 MI EAST OF LA 5โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 7502 over WASHITA RIVER | bridge | County Highway Agency | 5.4 MI W CORNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | NW 10TH ST. over N. CANADIAN RIVER | bridge | City or Municipal Highway Agency | .4 MI E CANADIAN C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0108 over BAYOU D'INDE | bridge | State Highway Agency (LADOTD) | 2.5 MI. NE OF LA 1133โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US0061 over BLIND RIVER | bridge | State Highway Agency (LADOTD) | 3.74 M W of LA 641โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 39 over SANDERS CREEK | bridge | State Highway Agency (TxDOT) | 3.40 MI SE OF SH 164โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3015 over BAYOU GRAND CANE RELIEF | bridge | State Highway Agency (LADOTD) | 7.75 MI EAST OF LA 5โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 2878 over WAGGONER CREEK | bridge | State Highway Agency (TxDOT) | 0.95 MI N OF IH 30โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 2 over KIAMICHI RIVER | bridge | State Highway Agency (ODOT) | 17.0 MI N JCT SH 3โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | CR 427-J Wanderin over Glazy Peau Creek | bridge | County Highway Agency | gJct. Glazy Peau Rd.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FAS 1207 over CLEAR BOGGY CREEK | bridge | County Highway Agency | 1.0 MI W 5 MI N BOSWELโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 2 over KIAMICHI RIVER | bridge | State Highway Agency (ODOT) | 15.3 MI N JCT SH 3โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | S.H. 50 over CIMARRON RIVER | bridge | State Highway Agency (ODOT) | WOODS-WOODWARD C/Lโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0027 over KELSO BAYOU/HACKBERRY | bridge | State Highway Agency (LADOTD) | 10 MI S OF LA 108โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Landfill Ln. over SIMMONS BAYOU | bridge | County Highway Agency | 0.1 Mi W of Berwick Rd.โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | RAOUL ROAD over BAYOU | bridge | County Highway Agency | 0.4 M W of LA 101โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3015 over BAYOU GRAND CANE | bridge | State Highway Agency (LADOTD) | 7.7 MI EAST OF LA 5โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BRYAN ROAD over BAYOU GRAND | bridge | County Highway Agency | 1.9 MI W of LA 26โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | BROADMOOR DR over BRIAR CREEK | bridge | City or Municipal Highway Agency | 0.45 MI N OF 29TH STโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 84 WB over SH 31 | bridge | State Highway Agency (TxDOT) | 5.7 Mi NW of LP 340โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 84 EB over Tehuacana Creek Relief | bridge | State Highway Agency (TxDOT) | 0.5 Mi SW of SH 31โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SH 87/Fulton Co. over LITTLE CREEK | bridge | State Highway Agency (ARDOT) | 7.7 MI N US 62โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 281 over DRAIN | bridge | State Highway Agency (TxDOT) | 0.30 MI NW OF IH 410โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FM 471 over MEDINA RIVER | bridge | State Highway Agency (TxDOT) | 0.53 MI N OF FM 4713โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA3139 over ICC.G. RR | bridge | State Highway Agency (LADOTD) | .7 MI EAST OF LA 3154โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Belt Line Road over Drain | bridge | City or Municipal Highway Agency | 0.14 MI W OF PLANO RDโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 820 WB over LAKE WORTH CAHOBA HERON | bridge | State Highway Agency (TxDOT) | 1.8 MI NE OF SILVER CK Rโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 820 EB over NAVAJO TRAIL | bridge | State Highway Agency (TxDOT) | 1.5 MI SW OF SH 199โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SAWMILL TRAIL over HCFCD DITCH | bridge | City or Municipal Highway Agency | 0.40 MI W OF PINE MOSS Dโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 10 over DRAW | bridge | State Highway Agency (TxDOT) | 4.75 MI W OF US 190โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0153 over DEMERY CREEK | bridge | State Highway Agency (LADOTD) | 5.50 MI. N OF INT LA9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0153 over CABIN CREEK | bridge | State Highway Agency (LADOTD) | 7.66 MI. N OF INT LA9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0008 over LITTLE-SANDY-CREEK | bridge | State Highway Agency (LADOTD) | .1 MI EAST OF LA 464โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 45 SB over HOV ACCESS RD | bridge | State Highway Agency (TxDOT) | IH 610 @ IH 45 (INTERCHGโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | IH 45 SB over IH 610 WB FR & HOV ACCES | bridge | State Highway Agency (TxDOT) | IH 610 @ IH 45 (INTERCHGโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0070-S over DRAIN | bridge | State Highway Agency (LADOTD) | 0.3 M SW of LA 70&LA 312โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | SHADOW CLIFF over DRAW | bridge | City or Municipal Highway Agency | 0.30 MI NW OF HENDERSNโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0070 over DRAIN | bridge | State Highway Agency (LADOTD) | 0.8 M SW of LA 70&LA 312โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 59 NBML over Brooks Branch | bridge | State Highway Agency (TxDOT) | 0.40 MI NE OF FM 2919โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | US 59 over DRAINAGE DITCH | bridge | State Highway Agency (TxDOT) | 2.50 MI NE OF FM 2919โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0153 over ANTOINE CREEK | bridge | State Highway Agency (LADOTD) | 9.55 MI. N OF INT LA9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | FL-5150 over Embudo Arroyo | bridge | City or Municipal Highway Agency | 0.24 M S Indian School Rโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0153 over ANTOINE CREEK | bridge | State Highway Agency (LADOTD) | 9.82 MI. N OF INT LA9โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | McArthur Dr over BAYOU JOE MARCEL | bridge | Town or Township Highway Agency | 00.25 MI NORTH OF LA 10โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | JONES-MALTSBERGER over DRAIN | bridge | State Highway Agency (TxDOT) | 0.10 MI SW OF US 281โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0500 over FUNNY LOUIS BAYOU | bridge | State Highway Agency (LADOTD) | 1.45 MI WEST OF US 84โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LOMBARDY ST over IH 45 SB FR | bridge | State Highway Agency (TxDOT) | 1.00 MI NW OF US 90Aโ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Sh-42/Sec-5/L-2.7 over Drainage Ditch | bridge | State Highway Agency (ARDOT) | 76.0 Mi West Jct I-55 & 4โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0009 over DRY CHOCTAW CREEK | bridge | State Highway Agency (LADOTD) | 0.91 MI. NORTH OF LA 479โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0009 over CHOCTAW CREEK | bridge | State Highway Agency (LADOTD) | 2.26 MI. NORTH OF LA 479โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0009 over EIGHT MILE CREEK | bridge | State Highway Agency (LADOTD) | 0.45 MI. NORTH OF LA 126โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | LA0009 over BRICKYARD BRANCH | bridge | State Highway Agency (LADOTD) | 1.79 MI. NORTH OF LA 126โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
| overdue | Military Pkwy over LP 12 (Buckner Blvd) | bridge | State Highway Agency (TxDOT) | 2.3 Mi S of IH 30โ | 2002 | NBI age 49yr โ past first 25-yr repaint cycle; verify recoat history with owner |
Cycle basis: bridges ~25yr steel repaint (NBI age) ยท dams NID condition + ~20yr ยท AST tanks API-653 (5yr ext) ยท pipelines PHMSA ~7yr integrity ยท well-site tank batteries ~10-15yr. Confidence reflects how much real per-asset data (age/condition) backs the estimate vs. a generic cycle assumption.