← All facilities

WHITE 67/CR75 O/P over US 67-SEC 13

State Highway Agency (ARDOT)·bridge·4.48 MI NE JCT US 167, AR·map ↗
⛔ Coating likely OVERDUE · est. window 2004
confidence 0.45

NBI age 47yr — past first 25-yr repaint cycle; verify recoat history with owner

👤 Asset owner contacts

This facility isn't linked to a parent operator yet, so no contacts are attached. (Operator links come from EPA owner + SEC matching.)

🎯 Predicted turnaround windows

No predictions yet — run scripts/run_predictions.py after ingesting events.

🔥 Regulatory timeline (0)

    💰 Capex signals (0)

    No capex signals found for this facility yet.